Modular LNG Plant (422 Ton Per Day) – Ready With Commissioning.
60 X 104 Nm3/d LNG plant is based on process design and equipment structure design, it considers sufficiently the plant safety, reliability, and advancement, meanwhile, it is easy to operate and maintain so that it operates steadily in a long term.